Roll-out in FIVE STEPS

With EasyFiber® the roll-out
costs are reduced by 30%

1

Cleaning the pipes.

TV-inspection.

Analyzing the
characteristic
features of
the pipes.

2

Attaching the clips
to the duct.

Rolling-out the duct.

3

Tensing the duct
between two
manholes.

4

Introducing the robot
in the pipes.

Positioning the duct
under the arch of the
pipe.

Securing the duct in
the manholes.

5

Introducing the
optical fiber in the
duct.

Equipping the
manholes with the
splicing boxes.